In order for Gasunie to achieve the intended result of the contract (see section 2.1.1), you shall be required to perform various activities, also referred to as the ‘contract scope’. These activities are, in general terms, outlined below: • Engineering, manufacturing, assembly, testing (FAT), transportation to Gasunie site and testing on site (SAT) of compact stations. • Each compact station contains: o Concrete housing. o One hermetically sealed oil type 400 kVA 33kV/0,41 kV transformer. o One low voltage distribution board. o One socket outlet rack on the outside of the compact station. • Engineering, manufacturing, assembly, testing (FAT), transportation and testing on site (SAT) of one walkable enclosure: o Steel housing/container (to contain a dry type 6.3MVA 33kV/20kV transformer the transformer will be supplied by Gasunie). o 20 kV switchgear including 1 incoming and 2 outgoing feeders. • FAT at supplier’s factory. • SAT including testing on site and commissioning support.
Gepubliceerd
13.10.2026
Open voor inschrijvingen
13.10.2026
Sluitingsdatum
18.11.2026
Onderhoudscontract GE VSD elektromotoren met magneetlagering
Gegund·Oct 30
Medewerkersonderzoek
Gegund·Oct 29
Integration Consultant Concept Select
Gegund·Oct 29
Hijswerkzaamheden voor Inline inspectie
Open voor inschrijvingen·Oct 29
Europese openbare aanbesteding Groenonderhoud en Gladheidsbestrijding Hoofdkantoor ten behoeve van de N.V. Nederlandse Gasunie uitgevoerd via Ariba
Open voor inschrijvingen·Oct 22
Hijswerkzaamheden voor Inline inspectie
Open voor inschrijvingen·Oct 22
31103897 Tilburg 3 (TB3)
Gegund·Nov 1
Outsourcing salaris administratie
Gegund·Nov 1
Femtosecond laser system with tunable OPA
Open voor inschrijvingen·Nov 1
End user devices
Gegund·Nov 1
31187282: Groot onderhoud A2 en A6 (2025, 2026)
Gegund·Nov 1
Monitor Bevolkingsonderzoek naar Kanker (BVOK)
Gegund·Oct 31
Maak een account aan om deze aanbesteding te onderzoeken en vergelijkbare kansen te vinden.