The Supplier is required to strip topsoil, including residual vegetation clearance and deposition in Topsoil Storage Areas. Topsoil stockpiles are to be managed by the Subcontractor for the duration of the subcontract works, including spraying and treatment necessary by the Subcontractor to maintain the integrity of the material for re-use. The supplier is required to undertake site clearance, to include but not limited to: Wall removal and set aside for reuse Fence removal and disposal Gate removal and disposal Kerb and drainage removal and disposal Sign post removal and disposal Allowance for removal / cutting of tree root systems and disposal Allowance for hard dig and disposal of arisings
Gepubliceerd
22.07.2026
Open voor inschrijvingen
22.07.2026
Sluitingsdatum
05.08.2026
MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 3 (Royal Portbury Dock Road)
A66 Northern Trans-Pennine Project (NTP) - Schemes 1 and 2 Central Reservation Works - Phase 2
Single Supplier Framework Active Travel Development
Walton Breck Road Highway Improvement Works
Civils Resources_2023 - Work Order 027/23
Civils Resources_2023 - Work Order 026/23
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
Monitoring Support and Data Management Services for Continuous Air Quality Monitoring Sites
NHP - Hospital 2.0 Alliance (H2A) Framework Call-Off Contract FHFT
SEN20465-SEN-TAXI-THE NEWBRIDGE SCHOOL
Corporate Eyecare Services
© 2026 SIA «Vietne». Alle rechten voorbehouden.