Background and purpose The purpose of this procurement is to replace several of Lokaltogs existing diesel trainsets from the 90's in Region Zealand with 14 new Battery Electric Multiple Units (BEMU) trains enabling Lokaltog to carry out its passenger transport operation on specific lines with zero emission technology, specifically trains powered by battery and able to run under catenary line. Lokaltog is operating traffic on multiple conventional single track rail lines on the islands of Sjælland, Lolland and Falster. Traffic is often dense with fixed timetables corresponding to further train connections, busses, schools etc. There are multiple level crossings on the lines. Most of the traffic is performed on Lokaltog’s own infrastructure, but some traffic is performed on the Danish state-owned railway infrastructure of Banedanmark. The 14 BEMU trains must not exceed 47 meters in length and will be deployed on the “Østbanen” and “Tølløsebanen” lines of Lokaltog including the line Køge – Roskilde of Banedanmark. The BEMU trains might at a later point be put into service on the “Lollandsbanen” and “Odsherredsbanen” lines. The 14 BEMU trains will be maintained by Lokaltog at the workshop in Hårlev. Lokaltog will exchange trains between Østbanen and Tølløsebanen for maintenance purposes. Main deliveries • Delivery of 14 BEMU trains • Delivery of an initial package of repairable components and special tools • Delivery of spare parts for preventive maintenance until 15 years after final takeover of the last train • Delivery of obsolescence management until 15 years after final takeover of the last train • Documentation, including but not limited to, spare parts list, documentation related to homologation, maintenance schedule and instructions, operating manual, and safety documentation • Training of Lokaltog’s driving instructors and technical staff in the trains operation and performance The contract includes an option for Lokaltog to make an order of maximum 10 additional BEMU trains, including spare parts supply.
Paskelbta
11.10.2024
Sutartis suteikta
11.10.2024
Jord- og materialedisponering - renovering af Gribskovbanen
Uždaryta·Aug 31
Sporrenovering på Gribskovbanen
Uždaryta·Aug 10
Charging Infrastructure at Hårlev Station
Sutartis suteikta·Aug 7
Nærum - Train solution
Sutartis suteikta·Sep 25
Train solution - Nærumbanen
Uždaryta·Sep 25
Nærum - Train solution
Uždaryta·Sep 16
Lease of locomotives
Sutartis suteikta·Oct 27
Lease of locomotives
Uždaryta·Jun 10
Supply and Maintenance of automated S-trains - (New automated S-trains)
Sutartis suteikta·Mar 5
Levering af enhedshjul til LINT 41 byggeserie 1, 2 og 3
Uždaryta·Jun 27
New Trains – Supply and Maintenance of Electronic Trainsets
Sutartis suteikta·Dec 14
New Trains – Supply and Maintenance of Electronic Trainsets
Sutartis suteikta·Dec 1
Procurement of monoflange valves for Køge, Herning and Frøslev - 26/12038
Sutartis suteikta·Nov 5
GENOP-BR Renovering af brolægning på fortove (Indgået kontrakt GENOP-BR.310.14)
Sutartis suteikta·Nov 5
- Hovedentreprise
Priima pasiūlymus·Nov 5
ICP-MS/MS system for elemental analysis of high-salinity brines
Sutartis suteikta·Nov 5
Midlertidige pavilloner anvendt til udslusningspladser
Priima pasiūlymus·Nov 5
Udbud af helhedspleje
Sutartis suteikta·Nov 5
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.