To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate various compounds (including railheads) along the route, to meet the construction logistics requirements of FBRS and also support the requirements of other Railway System Contractors from the Alliance. These compounds will require temporary works that will not form part of the final permanent works. The number and location of the compounds to be used are still to be confirmed at this stage: The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer where required. Examples of the scope of this required design works are as follows (but not limited to) within compounds and railheads- •Temporary site buildings and offices •Temporary utilities & services •Temporary roadways and hardstandings •Temporary site drainage systems •Fencing •Lighting & Security systems Note: the scope does not include any design of Track layouts and geometry, Track, Track drainage, LWR and S&C hardstanding areas, associated gantry foundations within the railheads. Potential mobilization start (soft start) in October 2026 - then estimated full start February 2027.
Paskelbta
01.05.2026
Priima pasiūlymus
01.05.2026
Terminas
15.05.2026
Transport of slabs
Priima pasiūlymus·Oct 21
LWR Trailer Solution
Uždaryta·Aug 18
Temporary Works Designer (Track Design Railhead)
Uždaryta·May 1
Temporary Works Designer - Framework
Uždaryta·May 1
Temporary Works Designer (Track Design Railhead)
Uždaryta·May 1
Procurement for Designated Roles (PSC) Independent Safety Assessor (ISA) professional service (extended)
Uždaryta·Apr 22
Temporary Agency Staff for Drainage Engineer
Sutartis suteikta·Oct 20
Technical Approval Authority - Advisor
Sutartis suteikta·Sep 29
PS26279 - 2N245 Server Room Cambridge
Sutartis suteikta·Sep 24
NW - CDF - Lot 1 - Glasson Dock Gate Detailed Design
Sutartis suteikta·Sep 22
CA18274 - ITT 44/2026 44 - ICT For Newry City to Poyntzpass Greenway Improvements BCC Framework Lot 1
Sutartis suteikta·Sep 18
BRE037 - 100ft Desilting 2026-2027
Sutartis suteikta·Sep 15
CBC-1682-FA-LS-FC-58-ZH 35 Upper Shelton - AWARD
Sutartis suteikta·Oct 24
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.