Otnox
UKJungtinė Karalystė·Perkančioji organizacija: Guys and St Thomas NHS Foundation Trust

Substation 9 LV Panel & Generator Replacement and Evelina Standby Power

Sutartis suteikta·3 rugp. 2026·GBP 3,978,198

The Trust has a requirement for the replacement of Electrical Substation 9 and an upgrade to the Evelina standby power system. The objective of the project is to remove the obsolescence risk for the existing LV electrical switch panels, and interlinked stand-by generators to meet the requirements of the existing electrical services. This requirement needs to be delivered to allow for the expansion for the 'Evelina PTC' and the additional power requirements and system resilience that this project demands. This paper recommends the award of a contract to ETA Projects Ltd. The new contract will help provide the Trust with a safe and reliable source of power into the future removing the reliance on hired in temporary generators and the expansion of the Evelina Children's Hospital for cancer treatment. This was awarded through the HTE framework Consultancy Solutions and Advisory Services 2023/S 000-024003

Terminas

31.10.2025

Paskelbta

03.08.2026

Sutartis suteikta

03.08.2026

Otnox

Raskite pirkimus, kuriuose verta dalyvauti.

Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.

  • Pirkimo dokumentaiPeržiūrėkite turimus failus vienoje darbo aplinkoje.
  • Reikalavimai ir rizikosUžsakykite dokumentų analizę su nuorodomis į šaltinius.
  • Jūsų pirkimų atrankaTęskite su pasirinktomis rinkomis ir veiklos sritimis.