The Trust has a requirement for the replacement of Electrical Substation 9 and an upgrade to the Evelina standby power system. The objective of the project is to remove the obsolescence risk for the existing LV electrical switch panels, and interlinked stand-by generators to meet the requirements of the existing electrical services. This requirement needs to be delivered to allow for the expansion for the 'Evelina PTC' and the additional power requirements and system resilience that this project demands. This paper recommends the award of a contract to ETA Projects Ltd. The new contract will help provide the Trust with a safe and reliable source of power into the future removing the reliance on hired in temporary generators and the expansion of the Evelina Children's Hospital for cancer treatment. This was awarded through the HTE framework Consultancy Solutions and Advisory Services 2023/S 000-024003
Terminas
31.10.2025
Paskelbta
03.08.2026
Sutartis suteikta
03.08.2026
Ward Refurbishment Programme (Sourcing) - Quantity Surveyor
Sutartis suteikta·Oct 26
Renewal of Benchmarking Tool - Platform+
Sutartis suteikta·Oct 1
St Thomas' Hospital Energy Project Commercial Support
Sutartis suteikta·Oct 1
UPS and IPS Purchase
Sutartis suteikta·Sep 28
Structural and Civils Designer - Somerset and Samaritan Wards
Sutartis suteikta·Sep 15
Mechanical, Electrical , Public Health (MEP) Design, Albert, Somerset & Samaritan Wards
Sutartis suteikta·Sep 15
Site Power HV/LV Electrical Design
Uždaryta·Aug 10
PCI_LotA_174 Energy Infrastructure and opportunities analysis
Sutartis suteikta·Feb 16
Accountancy Apprenticeships
Sutartis suteikta·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Sutartis suteikta·Oct 29
Transition and Exit Technical Support Service
Sutartis suteikta·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Sutartis suteikta·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Priima pasiūlymus·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Sutartis suteikta·Oct 29
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.