ASG has been commissioned to deliver the supply, installation, testing, and commissioning of access control systems, CCTV equipment, and associated infrastructure within the Tower Basement at Gloucestershire Royal Hospital. To support the safe and efficient delivery of these works, this related project involves the provision of a secure temporary site compound within the Gloucestershire Royal Hospital estate. The scope includes the supply, installation, maintenance, and subsequent removal of the compound, which will be used for the secure storage of materials, equipment, and tools required for the Tower Basement Access Control and CCTV project. The compound will provide a controlled and secure storage facility, helping to protect project assets, maintain site safety, reduce operational disruption, and support the timely delivery of the works. Upon completion of the project, the compound will be fully decommissioned and removed, with the area reinstated as required.
Terminas
01.07.2026
Paskelbta
17.07.2026
Sutartis suteikta
17.07.2026
Lot 12 - Albert Street Play Area
Sutartis suteikta·Sep 22
A66 Tees Dock Road Lackenby Access
Sutartis suteikta·Sep 21
Willow House Enabling Works
Sutartis suteikta·Aug 7
Oceansgate Phase 3.1 Enabling Works
Sutartis suteikta·Jul 24
Old Westgate Station Hotel Development, Wakefield
Sutartis suteikta·Jul 1
M6 Lune Gorge - Roundthwaite Box - Civils Package
Uždaryta·Jun 25
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Homes England - Service Now & Operating Model Assessment
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.