The Seatoun Tunnel, constructed in 1906–1907 by the former Miramar Borough Council, is a historically significant structure connecting the Wellington suburbs of Seatoun and Strathmore. It served as a key link for Wellington’s tram system and remains the main access point for Seatoun. Measuring approximately 144 meters in length and 8.2 meters in width, the tunnel now requires maintenance work. This includes cleaning and repainting the internal surfaces (walls and ceiling), the handrail and railing, the fencing above the Seatoun portal and the retaining wall at the Miramar end. Additionally, the footpath requires cleaning as well. As such, we are now requiring a qualified supplier to carry out painting and related maintenance works on the Tunnel.
Paskelbta
04.11.2026
Priima pasiūlymus
04.11.2026
Terminas
30.11.2026
130-140 Grafton Rd Retaining Wall Construction
Priima pasiūlymus·Nov 4
Kelburn Viaduct Safety Screens
Priima pasiūlymus·Nov 1
Hinau St Retaining Wall Remediation Works
Priima pasiūlymus·Oct 27
287-299 Karaka Bay Road – Seawall Renewal
Priima pasiūlymus·Oct 11
Landfill Rd, Opp 32 Stream Bank Remediation Works
Uždaryta·Oct 5
Future Recycling Processing Services
Uždaryta·Sep 28
130-140 Grafton Rd Retaining Wall Construction
Priima pasiūlymus·Nov 4
ROI - Drainage Contractor for Kaipara College - Site: Drainage Remediation
Priima pasiūlymus·Nov 3
Main Contractor for the Site: Carpark, Footpaths and Bus Shelter at Northcross Intermediate School
Priima pasiūlymus·Nov 3
Main Contractor for the Blocks 2, 11: Re-aligning classroom walls, Removal of ACM cladding, and Classroom Refurbishment at Northcross Intermediate School
Priima pasiūlymus·Nov 3
Main Contractor for the Block Temp: Classroom Refurbishment and Removal of ACM Cladding at Northcross Intermediate School
Priima pasiūlymus·Nov 3
Main Contractor for the Block 2: Toilet Refurbishment at Northcross Intermediate School
Priima pasiūlymus·Nov 3
130-140 Grafton Rd Retaining Wall Construction
Priima pasiūlymus·Nov 4
RFP Security Fencing OTRFP2026_649
Priima pasiūlymus·Nov 3
ROI - Drainage Contractor for Kaipara College - Site: Drainage Remediation
Priima pasiūlymus·Nov 3
Main Contractor for the Site: Carpark, Footpaths and Bus Shelter at Northcross Intermediate School
Priima pasiūlymus·Nov 3
Main Contractor for the Blocks 2, 11: Re-aligning classroom walls, Removal of ACM cladding, and Classroom Refurbishment at Northcross Intermediate School
Priima pasiūlymus·Nov 3
Main Contractor for the Block Temp: Classroom Refurbishment and Removal of ACM Cladding at Northcross Intermediate School
Priima pasiūlymus·Nov 3
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.