TDC is seeking a qualified and experienced Three Waters contractor who is ready to try their hand at something a bit different – not just construction, but design too. Raw water for treatment at the Temuka Water Treatment Plant is sourced from six bores - three located on the treatment plant site and three located approximately 400-500 metres away near the intersection of Orari Station and Coach Roads. Of the off-site bores, only one is currently in service, and raw water is conveyed to the treatment plant via a single 150mm diameter pipeline. The two other off-site bores are new. Additional raw water conveyance capacity is required to enable supply from the two new off-site bores and to meet increasing demand. There is also a requirement to introduce redundancy into this part of the system. To achieve this, TDC requires the construction of a second raw water pipeline. We want to trial giving you the parameters, and you provide us with the full package – design through construction, testing and completion of the installed pipeline.
Paskelbta
08.09.2026
Priima pasiūlymus
08.09.2026
Terminas
05.10.2026
RFP 2826 South Timaru Hydraulic Model Build and System Performance
Priima pasiūlymus·Oct 15
RFP2828 - Timaru CBD Tile Replacement Programme Investment and Delivery Plan
Uždaryta·Sep 22
2813 - Stafford Street and Barnard Street Water Services Renewal
Uždaryta·Sep 6
RFT2797 - Kellands Hill/Rosewill Valley/Cartwrights Roads “SH1 Resilience Route” Project
Uždaryta·Aug 19
RFT2647- Landsborough Road Bridge
Uždaryta·Aug 14
RFP2702 - Talbot Street Sewer Main Upgrade
Uždaryta·Jul 8
Lake Terrace Water Treatment Plant Seismic Strengthening
Priima pasiūlymus·Oct 25
Water and Wastewater Assets Valuation
Priima pasiūlymus·Oct 23
PNCC - 26_047 - Milson Line Water Reservoir Design and Build
Priima pasiūlymus·Oct 18
Water Mains Resilience Phase Three
Priima pasiūlymus·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Priima pasiūlymus·Oct 18
Accelerated Delivery Programme 2.0
Priima pasiūlymus·Oct 18
Lake Terrace Water Treatment Plant Seismic Strengthening
Priima pasiūlymus·Oct 25
Wastewater Network Pipe Rehabilitation 2627
Priima pasiūlymus·Oct 23
Advance Notice - Coronial Support Services Procurement
Priima pasiūlymus·Oct 23
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Priima pasiūlymus·Oct 23
Contract 26/77 - Railway Drain Stormwater Treatment - Request for Tender – Advertising Notice
Priima pasiūlymus·Oct 23
14622 - Brigham Creek Roundabout Improvements Detailed Design (RFT)
Priima pasiūlymus·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.