The provision of Quantitative Risk Analysis Support for the duration of the Arena Infrastructure Project (2026-2028). Call Off Contract from the West of England Combined Authority (WECA) NEC4 Professional Services Framework 2 (PSF2). The service is being commissioned to provide a quantitative risk report on a quarterly basis to help establish costs and risk to the project.
Terminas
05.03.2026
Paskelbta
16.07.2026
Sutartis suteikta
16.07.2026
Oaktree Av. & Finch Subways Structural Assessments
Sutartis suteikta·Sep 30
West & North Street Railway Bridge Structural Assessments
Sutartis suteikta·Sep 30
Bus Shelters A432 - Additional Bus Shelters on A432 Scheme
Sutartis suteikta·Aug 13
Bus Shelters A38 - Additional Bus Shelters on A38 Scheme
Sutartis suteikta·Aug 13
Reablement Service
Sutartis suteikta·Aug 11
Highway Design Engineer - Consultancy Engineer Support
Sutartis suteikta·Aug 6
Asbestos surveying and consultancy
Sutartis suteikta·Oct 27
CBC-1917-Q-SM Water Risk Assessments - AWARD
Sutartis suteikta·Jun 23
Fire Risk Assessments, Kingston Upon Hull
Sutartis suteikta·Nov 25
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Sutartis suteikta·Oct 31
March 2027 Bus Contracts
Sutartis suteikta·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Sutartis suteikta·Oct 30
Provision of Pre-Paid Cards
Sutartis suteikta·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Sutartis suteikta·Oct 30
Business Travel Services
Sutartis suteikta·Oct 30
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.