This is an enhancement scheme funded by the DfT and is part of a package of proposed measures in the Manchester area that are planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. The scheme is for the design and delivery of an East facing turnback, located on the Manchester, Bolton and Bury Line (ELR: MVE1) adjacent to the existing Salford Hope Street (Cemex) sidings between Salford Central Station and the Oldfield Road Bridge. At Victoria Station, the through platforms also accommodate terminating trains. The extended time to terminate and turnback in the platforms restricts platform availability for through services. The provision of the turnback siding will allow terminating services from the East arriving at Victoria to clear the platform, travel to the turnback siding and await their next turn of duty, clear of the station. There is the further benefit of an additional stop at Salford Central Station for passengers to disembark for Manchester Spinningfields, a major employment location in the city centre. The turnback would also act as a service recovery measure during times of service perturbation. The turnback is to consist of two roads, to accommodate trains up to 8 car x 24m in one road and 6 car x 24m in a second road; with access to and from platforms 3-6 at Manchester Victoria via existing connections. The new east facing turnback shall also be able to operate as a berthing/storage siding, with walking routes to allow train crew to access and egress the railway. The turnback will be fully electrified at 25kV and be fully signalled as a route for planned, rather than simply emergency, usage. Scope entails but not limited to: - Test all new FTN-x transmission circuits to support new FTN-x Network Requirements - Test and commission FTN-x equipment in existing FTN/FTN-x Nodes - Test new copper cables (Including VlVt where appropriate) - Test Existing spare pairs on copper cables - Testing of lineside telephony services - Updates to the Northgate Concentrator at MROC
Paskelbta
22.10.2025
Priima pasiūlymus
22.10.2025
Terminas
28.10.2025
Oldfield Road - E & P Works
Uždaryta·Oct 22
Brewery Turnback - ES6-8 Devegetation Works
Uždaryta·Oct 7
Brewery Turnback - ES6-8 E & P Works
Uždaryta·Oct 7
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Uždaryta·Oct 7
Brewery Turnback - ES6-8 OLE Infrastructure
Uždaryta·Oct 7
Brewery Turnback - ES6-8 Permanent Way
Uždaryta·Oct 7
Webex telephony and supporting hardware
Sutartis suteikta·Sep 11
Student Services Contact Cloud Centre (2026- 2029)
Sutartis suteikta·Apr 22
Student Services Contact Cloud Centre (2026- 2029)
Sutartis suteikta·Apr 22
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Homes England - Service Now & Operating Model Assessment
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.