Mary Seacole PSDS [LED & LV]

Sutartis suteikta·9 birž. 2026·GBP 780,973

The University is delivering the Mary Seacole Building decarbonisation project using funding secured through the Public Sector Decarbonisation Scheme (PSDS). The scheme proposes to undertake a targeted decarbonisation programme and comprises: • Full design, supply and installation of a roof-mounted photovoltaic (PV) array, including associated electrical works, inverters, metering, modifications to existing electrical network and lightning protection adjustments. • Full design, supply and installation of building wide LED lighting replacement, covering approximately 2,200 internal luminaires and 48 external fittings, alongside upgrades to lighting controls, emergency lighting and associated making good of building fabric.

Terminas

23.04.2026

Paskelbta

09.06.2026

Sutartis suteikta

09.06.2026

Sąlygos atnaujintos

09.06.2026

Otnox

Raskite pirkimus, kuriuose verta dalyvauti.

Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.

  • Pirkimo dokumentaiPeržiūrėkite turimus failus vienoje darbo aplinkoje.
  • Reikalavimai ir rizikosUžsakykite dokumentų analizę su nuorodomis į šaltinius.
  • Jūsų pirkimų atrankaTęskite su pasirinktomis rinkomis ir veiklos sritimis.