We are seeking to appoint a suitable and experienced contractor to dismantle, move and re-assemble an existing construction marquee at Old Oak Common (OOC) HS2 railway station. Dimensions 12x24 metres. Apex height 4.96 metres. Works under the contract are required for the end of April 2026 and contractors are required to have the relevant, quality, health and safety accreditations. E.g. Constructionline Silver or above, assessed by RISQS, ISO9001, ISO45001.
Paskelbta
10.02.2026
Aktīvs
10.02.2026
Terminas
16.02.2026
Floor Gullies and Channels - ANTHRO-PROC-PH4D
Uždaryta·Jun 18
Old Oak Common - Lighting Controller Ancillary Equipment (LGHT1)
Uždaryta·Apr 14
Old Oak Common - Lighting Controller Ancillary Equipment (LGHT1)
Uždaryta·Apr 14
Retail Meter Units - Elec8
Uždaryta·Mar 23
Retail Meter Units - Elec8
Uždaryta·Mar 23
Marquee dismantle, move, re-erect ANTHRO-PROC-LOG8
Uždaryta·Feb 10
CBC-1682-FA-LS-FC-58-ZH 35 Upper Shelton - AWARD
Sutartis suteikta·Oct 24
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.