The M6 Lune Gorge Structures Scheme requires Structural Monitoring across 6nr bridges, as well as CR monitoring to temporary piling on the scheme. The package will be split into 3 parts; Monitoring of the existing bridge substructures during demolition and replacement deck installation, monitoring of new construction considering settlement / tilt and vibration monitoring through construction and into post construction, and central reserve temporary embedded retaining walls works associated with piling / retaining wall construction. Tenderers will be required to propose an efficient manual / automated monitoring methodology meeting the stated frequencies, data capture, and reporting aligned with trigger and mitigation actions. Considerations around access and sequencing will be discussed. The package includes, but is not limited to: control points, baselining, routine monitoring (Ranging from daily to weekly), and maintenance.
Paskelbta
21.04.2026
Aktīvs
21.04.2026
Terminas
04.05.2026
A66 Northern Trans Pennine Project(NTP) - Carleton Underpass Structure (Precast Concrete Beams)
Priima pasiūlymus·Oct 15
A66 Northern Trans Pennine Project(NTP) - Schemes 1, 2 Traffic Signals Package
Uždaryta·Oct 5
A66 Northern Trans-Pennine (NTP) - Warcop MoD Pre-Construction ECI, Temp Works & Flood Modelling
Uždaryta·Sep 23
A66 Northern Trans-Pennine Project (NTP) - Scheme 1 & 2 Pavement Construction
Uždaryta·Sep 15
M6 Lune Gorge - Steel road bridge plates - Fabrication and Installation
Uždaryta·Sep 10
M6 Lune Gorge - Roundthwaite Structure Precast Concrete Units
Uždaryta·Sep 9
CWF Lot 2A - Town End (Orton) Bridge
Sutartis suteikta·Oct 6
M6 Lune Gorge Structures - Monitoring Services
Uždaryta·Apr 21
The Responsible Medical Officer (RMO) Braintree
Sutartis suteikta·Oct 26
The Purchase of 8 seater Vehicles
Sutartis suteikta·Oct 26
CPU 8676 Planting of meadow turf in three areas and 2 years of Establishment at St Peter's Street
Sutartis suteikta·Oct 26
26064 Cambridgeshire Carriageway Resurfacing 26/27 - Package 1 (Further Competition EHF 4, Lot 1)
Sutartis suteikta·Oct 26
37418 - West Gate School
Sutartis suteikta·Oct 26
Digital and Technology Solutions Apprenticeship Level 6
Sutartis suteikta·Oct 26
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.