Paskelbta
28.10.2026
Priima pasiūlymus
28.10.2026
Terminas
19.11.2026
Fabricated Components for the SR Embedded Floor Plates for the ALS-U Project
Priima pasiūlymus·Oct 19
Micro Electron Diffractometer (MicroED) System
Uždaryta·Oct 13
SR Power Supplies Rack Detailed Design for ALS-U
Uždaryta·Oct 12
Updated ALS SHB Pulsed RF HPA
Priima pasiūlymus·Oct 12
SR Power Supplies Rack Detailed Design for ALS-U
Uždaryta·Oct 8
SR Power Supplies Rack Detailed Design for ALS-U
Uždaryta·Oct 1
RPO Horizontal Boring and Milling Machine
Sutartis suteikta·Oct 28
RPO Horizontal Boring and Milling Machine
Sutartis suteikta·Oct 28
Milling Equipment
Priima pasiūlymus·Oct 27
CNC Small Wire EDM
Priima pasiūlymus·Oct 27
Two (2) DN PUMA 3100LY and Two (2) DN PUMA Y-Axis Horizontal Turning Centers
Priima pasiūlymus·Oct 27
A27-017 Fiber Laser Metal Marking Tool
Priima pasiūlymus·Oct 27
New Base 4 D Spectrum Cardio System Service at Edward Hines, Jr. VA Hospital 5000 South 5th Ave, Hines, IL 60141-3030
Sutartis suteikta·Oct 29
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4
Priima pasiūlymus·Oct 29
Replace, Nonskid Deck Covering on FWD 04 Level Weather Deck etc
Priima pasiūlymus·Oct 29
Bridge Extension for ISSO/ISSM Support
Priima pasiūlymus·Oct 29
Preserve, Passage In 4-10-6-1-L
Priima pasiūlymus·Oct 29
Support, Rev-01 (FO)~Well Deck Assessment
Priima pasiūlymus·Oct 29
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.