Gisborne District Council owns and maintains land drainage, rivers and coastal assets in the district that contribute to the protection of land, buildings, people and infrastructure from flooding and erosion. The scope of work for this contract is outlined in the Specifications and broadly includes key maintenance tasks such as spraying, mowing, excavation, vegetation removal, willow planting and management, culvert jetting, inspection and maintenance of dam, stopbank and pump station assets, and pre and post flood inspections of infrastructure. The estimated value of the Contract is approximately $1.5 million per annum. An initial contract term of seven years with a right of renewal, subject to performance, of a further three years (maximum contract term ten years) is proposed. The Contract commences on the 1 July 2027. A generous mobilisation period has been allowed for in the tender programme. Next steps: - Complete and return Appendix 1 – Proposal Acknowledgement Form indicating your intention to submit a Proposal. - Register for a Respondent Site Visit. Site Visits will be scheduled for the 26th and 27th August 2026.
Paskelbta
14.08.2026
Priima pasiūlymus
14.08.2026
Terminas
08.10.2026
Tokomaru Bay Landfill - Temporary Transfer Station Facility
Uždaryta·Sep 18
Package 4 (26-87) - Motu and Whakarau (upper section, RP 25-40km) Roads
Uždaryta·Aug 25
Package 3 (26-86) - Whakarau Road (lower section, RP 0-25km)
Uždaryta·Aug 25
Package 2 (26-85) - Tahora, Te Wera and Wharekopae Roads
Uždaryta·Aug 25
Package 1 (26-84) - Arakihi, Hokoroa, Ihungia, Mata, Tauwhareparae, Tuakau, Waimata Valley and West Ho Roads
Uždaryta·Aug 25
Package 5 (26-88) - East Cape, Rangitukia and Waikura Roads
Uždaryta·Aug 25
Lake Terrace Water Treatment Plant Seismic Strengthening
Priima pasiūlymus·Oct 25
Water and Wastewater Assets Valuation
Priima pasiūlymus·Oct 23
PNCC - 26_047 - Milson Line Water Reservoir Design and Build
Priima pasiūlymus·Oct 18
Water Mains Resilience Phase Three
Priima pasiūlymus·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Priima pasiūlymus·Oct 18
Accelerated Delivery Programme 2.0
Priima pasiūlymus·Oct 18
Lake Terrace Water Treatment Plant Seismic Strengthening
Priima pasiūlymus·Oct 25
Wastewater Network Pipe Rehabilitation 2627
Priima pasiūlymus·Oct 23
Advance Notice - Coronial Support Services Procurement
Priima pasiūlymus·Oct 23
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Priima pasiūlymus·Oct 23
Contract 26/77 - Railway Drain Stormwater Treatment - Request for Tender – Advertising Notice
Priima pasiūlymus·Oct 23
14622 - Brigham Creek Roundabout Improvements Detailed Design (RFT)
Priima pasiūlymus·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.