The Ministry for Cities, Environment, Regions and Transport (MCERT) is seeking proposals from experienced contractors for the replacement of a 20 metre section of quay wall at the Landing Reserve Dinghy Basin, Lake Taupō. The affected area has since been fenced off to prevent public access. Continued deterioration threatens adjacent marina assets and public safety, disrupt operations, and increase the likelihood of costly emergency repairs, reinforcing the need for timely remediation to maintain safe and reliable marina operations. A section of the existing quay wall has reached the point of structural failure, with the footing undermined and the surrounding area fenced off to protect public safety. Without timely remediation, continued deterioration threatens adjacent marina assets, disrupts operations, and increases the likelihood of costly emergency repairs. The solution will restore structural integrity by installing new steel sheet piles, removal of the compromised wall, and reinstating the surface and services to current standards. The design has been developed to modern engineering requirements, includes a 50‑year design life. The Lake Taupō Harbourmaster (now a MCERT function) is responsible for the safety and management of Lake Taupō, including oversight of water services and compliance with relevant policies and legislation. Completing this work will restore safe access to the marina and support lake users in time for the busy summer season. Please note: The draft contract document will be issued via an addendum once available. Respondents are encouraged to subscribe to this notice on GETS to receive automatic notification when the document is available.
Paskelbta
01.07.2026
Priima pasiūlymus
01.07.2026
Terminas
31.07.2026
Digitisation of the remaining physical records
Sutartis suteikta·Jul 4
HIRDS and groundwater data
Sutartis suteikta·Jun 22
NZ ETS Managed Auction Service
Sutartis suteikta·Jun 5
Standardised Plan Content – Local Government Planning Expertise
Sutartis suteikta·May 14
Executive Support - Leading Through Change
Sutartis suteikta·Apr 29
Planning System Transformation – Resource and Investment Plan
Sutartis suteikta·Apr 28
Main Roofing Contractor for gym roofing replacement at Heretaunga College
Priima pasiūlymus·Oct 22
Electrical Contractor for the Blocks B, C,D1, D3, L, 4: Lighting & Switchboard Replacement at Aorere College
Priima pasiūlymus·Oct 22
Main Building Contractor – E: Redevelopment at Queenstown Primary School
Priima pasiūlymus·Oct 22
Main Building Contractor - 1, 5,7: Roofing and Learning Space Upgrade at Tainui School
Priima pasiūlymus·Oct 22
Main Contractor for Block 8: Hessian and Wet Area Vinyl Replacement at Nga Iwi School
Priima pasiūlymus·Oct 22
Beach Road Pump Station - Electrical Upgrade
Priima pasiūlymus·Oct 22
Lake Terrace Water Treatment Plant Seismic Strengthening
Priima pasiūlymus·Oct 25
Wastewater Network Pipe Rehabilitation 2627
Priima pasiūlymus·Oct 23
Advance Notice - Coronial Support Services Procurement
Priima pasiūlymus·Oct 23
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Priima pasiūlymus·Oct 23
Contract 26/77 - Railway Drain Stormwater Treatment - Request for Tender – Advertising Notice
Priima pasiūlymus·Oct 23
14622 - Brigham Creek Roundabout Improvements Detailed Design (RFT)
Priima pasiūlymus·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.