Kier Infrastructure is seeking to establish a dedicated supply chain to deliver a programme of surveys in support of the design development and Environmental Impact Assessment (EIA) requirements for one of our contracts. the scope for the Water Environment surveys will include but not limited to: - Groundwater feature surveys - GWDTE, springs, sinks and abstractions - Surface water reconnaissance surveys - HEWRAT surveys - Flood risk surveys - Fluvial geomorphology Note there is no additional scope information at this time.
Paskelbta
26.05.2026
Aktīvs
26.05.2026
Terminas
02.06.2026
Kier Infrastructure - UXO Site Surveys
Uždaryta·Sep 28
Kier Infrastructure - Engineering Bridge Structural Survey
Uždaryta·Sep 16
Kier Infrastructure - Cultural Heritage Surveys
Uždaryta·May 26
Kier Infrastructure - Agriculture, Forestry and Soils Surveys
Uždaryta·May 26
Kier Infrastructure - Sound, Noise and Vibration Surveys
Uždaryta·May 26
Kier Infrastructure - Air Quality Surveys
Uždaryta·May 26
Bat Surveys and Licencing 2026
Sutartis suteikta·Jun 9
Kier Infrastructure - Cultural Heritage Surveys
Uždaryta·May 26
Kier Infrastructure - Agriculture, Forestry and Soils Surveys
Uždaryta·May 26
Kier Infrastructure - Sound, Noise and Vibration Surveys
Uždaryta·May 26
Kier Infrastructure - Cultural Heritage Surveys
Uždaryta·May 26
Kier Infrastructure - Sound, Noise and Vibration Surveys
Uždaryta·May 26
CBC-1682-FA-LS-FC-58-ZH 35 Upper Shelton - AWARD
Sutartis suteikta·Oct 24
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.