The scope of works for this package includes: • Supply, installation, and commissioning of ground and ground-water monitoring instrumentation systems • Data acquisition and telemetry for transmission to a Client owned database and visualisation platform (This package of work does not include provision of the database) • All instrumentation is expected to be battery or solar powered • Compliance with relevant industry standards and regulatory requirements • Joint Ventures/Alliances will be considered Packages of work area as follows: InSAR Satellite • Provision of historical data to cover the area of Sizewell B and Sizewell C. • Provision of multi-directional coverage and analysis of the Sizewell B and Sizewell C area until 2036 (period maybe extended). Unit 1 and 2 Plastic Wall Monitoring • Commence September 2026, end June 2027 • Drilling of approx. 200nr installation boreholes to a depth of 55m below ground level • Installation of IPI, IPIX, VWP and GNSS positional location monitoring Unit 1 and 2 Retaining Walls • Commence September 2026, end January 2028. • Installation in void formers at 200nr locations • Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring Shafts and Tunnels • Commence May 2027, end December 2027. • Installation in void formers at 50nr locations • Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring Backfill Specification • Commence September 2027, end January 2029. • Installation under main nuclear islands • Installation of horizontal Inclinometers/SAA, hydraulic settlement cells and extensometers Provision of Maintenance Team • Commence September 2026, end December 2036 (maybe extended. • Provision of maintenance services to ensure operation of installed instrumentation, maintaining solar and battery powered equipment. • Undertaking manual monitoring where necessary Additional information: It will be beneficial for you to describe your business as mush as possible and highlight where you can help us to achieve our values described above
Paskelbta
29.04.2026
Aktīvs
29.04.2026
Terminas
08.05.2026
Tunnel Segment Production Monitoring System copy
Uždaryta·Aug 17
Tunnel Segment Production Monitoring System
Uždaryta·Aug 12
Site Power HV/LV Electrical Design
Uždaryta·Aug 10
Tunnel Segment Production Monitoring System
Uždaryta·Aug 6
Fire and Rescue Services
Uždaryta·Apr 29
Instrumentation and Monitoring
Uždaryta·Apr 29
BBV Delta Junction - HSST1040 - Permanent I&M cable tray containment system
Uždaryta·Sep 8
Instrumentation and Monitoring
Uždaryta·Apr 29
Full Scale Mooring Test Line Rig ORE/23/089
Sutartis suteikta·Oct 24
Infrastructure Connection Design Support - Pathology Lab
Sutartis suteikta·Oct 30
Provision of Pre-Paid Cards
Sutartis suteikta·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Sutartis suteikta·Oct 30
Business Travel Services
Sutartis suteikta·Oct 30
Call-Off : GLCCA Project, Programme and Portfolio Management Solution
Sutartis suteikta·Oct 30
QLT354 2026-10-29 (0900) Leiston - Roman Hill Primary School, Lowestoft (8 seats and a PA) - AWARD
Sutartis suteikta·Oct 30
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.