This project aims to fill key knowledge gaps about the physiology, growth, and viability of the rhizomes of Manchurian wild rice (Zizania latifolia, MWR) in New Zealand (NZ) in order to increase efficacy of treatment and shorten the timeframe required to eliminate infestations of this harmful weed. This will involve the collection of rhizome material from sites in NZ, growth, examination, and manipulation of the material in a laboratory, and testing biosecure disposal methods. From this, we are looking to understand what it is that makes MWR rhizomes so tolerant to herbicide treatment, what factors determine how well herbicides translocate to the rhizomes, how long we have to monitor sites for regrowth and how we can safely dispose of excavated rhizome material.
Paskelbta
15.09.2026
Priima pasiūlymus
15.09.2026
Terminas
20.10.2026
407567 Future Proofing Nematology
Priima pasiūlymus·Oct 15
RFQ for Identity, Integration, and Database Management as a Service (DBMAAS)
Priima pasiūlymus·Oct 9
Interim Organisational Design, Modelling and Workforce Visualisation Platform
Priima pasiūlymus·Oct 5
Quantifying Risk and Treatment Needs for Corbicula Vectors
Priima pasiūlymus·Oct 2
2026 Innovation Investment Round - Round 2
Priima pasiūlymus·Oct 1
O - C0039170 Poultry Biosecurity Grant
Priima pasiūlymus·Oct 1
15153 - Queenstown Offline Public Transport Scoping Study (RFT)
Priima pasiūlymus·Oct 21
407567 Future Proofing Nematology
Priima pasiūlymus·Oct 15
Quantifying Risk and Treatment Needs for Corbicula Vectors
Priima pasiūlymus·Oct 2
TRC - North Taranaki Flood Forecasting Tools - September 2026
Uždaryta·Sep 10
Youth Health Wellbeing Survey 2028 - MSD
Uždaryta·Aug 21
eRNA Validation for Environmental Screening for Avian Influenza Viruses
Uždaryta·Jul 30
Lake Terrace Water Treatment Plant Seismic Strengthening
Priima pasiūlymus·Oct 25
Wastewater Network Pipe Rehabilitation 2627
Priima pasiūlymus·Oct 23
Advance Notice - Coronial Support Services Procurement
Priima pasiūlymus·Oct 23
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Priima pasiūlymus·Oct 23
Contract 26/77 - Railway Drain Stormwater Treatment - Request for Tender – Advertising Notice
Priima pasiūlymus·Oct 23
14622 - Brigham Creek Roundabout Improvements Detailed Design (RFT)
Priima pasiūlymus·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.