In December 2025 investigatory works were undertaken to establish the condition of the reinforced concrete, concentrating mainly around half-joints and movement joints in the bridge deck. The results of these investigations have been incorporated in a set of construction drawings and a repair specification. This information will form the basis of a Stage 2 contract to implement repairs and replacement of movement joints.
Terminas
01.06.2026
Paskelbta
14.10.2026
Sutartis suteikta
14.10.2026
Heron Hill - Window & Door Replacement
Sutartis suteikta·Oct 20
Legal Services Contract for the Heart of Barrow
Sutartis suteikta·Oct 20
CWF Lot 2A - Moss Side Cattle Grid Replacement
Sutartis suteikta·Oct 9
CWF Lot 2A - Town End (Orton) Bridge
Sutartis suteikta·Oct 6
CWF Lot 1B - WF2506 04 Askam Village School - Electrical and Fabric Works
Sutartis suteikta·Oct 6
Nether Bridge Parapet Repairs
Sutartis suteikta·Oct 6
Nether Bridge Parapet Repairs
Sutartis suteikta·Oct 6
Keswick to Threlkeld Bridge Deck Replacement Design and Installation
Sutartis suteikta·Aug 3
The Responsible Medical Officer (RMO) Braintree
Sutartis suteikta·Oct 26
The Purchase of 8 seater Vehicles
Sutartis suteikta·Oct 26
CPU 8676 Planting of meadow turf in three areas and 2 years of Establishment at St Peter's Street
Sutartis suteikta·Oct 26
26064 Cambridgeshire Carriageway Resurfacing 26/27 - Package 1 (Further Competition EHF 4, Lot 1)
Sutartis suteikta·Oct 26
37418 - West Gate School
Sutartis suteikta·Oct 26
Digital and Technology Solutions Apprenticeship Level 6
Sutartis suteikta·Oct 26
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.