The Bay of Plenty Regional Council is seeking a suitably qualified civil construction contractor to deliver Stage 4A of Whakatāne Project Future Proof, a key component of the ongoing flood resilience improvements along the lower Whakatāne River. Stage 4A is located adjacent to the Whakatāne Boat Ramp and will replace and upgrade a section of the existing flood defense network while maintaining flood protection throughout construction. Contractors will be required to demonstrate robust construction methodologies that ensure flood protection can be reinstated to existing levels should a flood risk be forecast during the works. Briefly, the physical works include: • Location, protection and management of all existing services during construction. • Establishment of the work site, temporary access arrangements, environmental controls, laydown and stockpile areas, and traffic management. • Site clearance, including removal of vegetation, obstructions, existing pavement, kerb and channel, sections of existing floodwall, and associated water services. • Excavation and pavement reconstruction works, including new kerb and channel, concrete surfaces, footpaths and associated reinstatement. • Removal, relocation and reinstatement of existing water supply infrastructure and associated pipework. • Construction of a new floodwall, including excavation, reinforced concrete footings, stitch pours and installation of precast floodwall panels. • Design, fabrication and installation of flood gates at vehicle access locations to maintain flood protection continuity. • Construction of service penetrations and associated seepage control and drainage measures through the flood protection structure. • Relocation and reinstatement of streetlight poles, services and associated infrastructure. • Earthworks, topsoiling, landscaping and full site reinstatement. • Working alongside the public, boat ramp users, nearby businesses and stakeholders to minimise disruption throughout construction. • Preparation and submission of as-built information, quality assurance records and all contract documentation required for completion and handover. • Associated project management, environmental management, health and safety management, site supervision and all other works described or implied in the contract documents
Paskelbta
03.08.2026
Priima pasiūlymus
03.08.2026
Terminas
28.08.2026
CON001926-G Whakatane Future Proof Stage 4A: Flood Gates
Priima pasiūlymus·Oct 9
CON001927 - Whakatāne Project Future Proof - Stage 4B
Priima pasiūlymus·Oct 1
Ohineangaanga Stream Remediation Work / Erosion Repairs
Uždaryta·Aug 20
Ohineangaanga Stream Remediation Work / Erosion Repairs
Uždaryta·Aug 19
Whakatāne Project Future Proof – Stage 3B
Uždaryta·Jul 1
CON002038 Geothermal Drilling M30
Sutartis suteikta·May 28
746-27-261-PS - Kelston to New Lynn Cycling and Walking Connections
Priima pasiūlymus·Oct 13
CON001926-G Whakatane Future Proof Stage 4A: Flood Gates
Priima pasiūlymus·Oct 9
CON001927 - Whakatāne Project Future Proof - Stage 4B
Priima pasiūlymus·Oct 1
Huntly West Domain Courts Renewal
Uždaryta·Sep 18
Ohineangaanga Stream Remediation Work / Erosion Repairs
Uždaryta·Aug 20
Ohineangaanga Stream Remediation Work / Erosion Repairs
Uždaryta·Aug 19
ODC Cont 277 -Security and Noise / Anima Control Services
Priima pasiūlymus·Oct 27
A32 River Road Bridge Replacement
Priima pasiūlymus·Oct 27
Future delivery options for ACC's Medical Consumables and Medical Devices Services
Priima pasiūlymus·Oct 27
Financial Planning Tool
Priima pasiūlymus·Oct 26
RFP - Northland Trades Services Panel for Suppliers of Sign Writing and Signage Projects and Maintenance Services
Priima pasiūlymus·Oct 26
Registration of Interest (ROI) for a Bathroom Refurbishment at Sunnybrae Normal School
Priima pasiūlymus·Oct 26
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.