Construction of 258m3 attenuation basin as per designs Construction of new manhole off Yorkshire Water sewer with weir allowing water into basin as per design Construction of Headwall as per design Removal of Waste material as required.
Terminas
02.10.2025
Paskelbta
19.06.2026
Sutartis suteikta
19.06.2026
Sąlygos atnaujintos
19.06.2026
Kilners Bridge Structures Fund
Sutartis suteikta·Oct 15
Mini Competition under 76012 Flexible Procurement System (FPS) for the Provision of Supported Living Services in Thorne (Portfolio 7)
Sutartis suteikta·Oct 14
Mini Competition under 76012 Flexible Procurement System (FPS) for the Provision of Supported Living Services
Sutartis suteikta·Oct 14
Great Yorkshire Way Asphalt Preservation 2026/27
Sutartis suteikta·Sep 21
Spiner247
Sutartis suteikta·Sep 11
Webex telephony and supporting hardware
Sutartis suteikta·Sep 11
TD2426 - Derby Road Chellaston Drainage Lining
Sutartis suteikta·Aug 5
A66 - Scheme 3A - Penrith to Temple Sowerby - Drainage
Uždaryta·May 12
A66 - Scheme 3A - Penrith to Temple Sowerby - Drainage
Uždaryta·May 12
A70014 Tender Package (Stocking Lane Drainage & New Road Drainage)
Sutartis suteikta·Nov 14
Call off contract from Framework DN772512
Sutartis suteikta·Oct 6
CBC-1682-FA-LS-FC-58-ZH 35 Upper Shelton - AWARD
Sutartis suteikta·Oct 24
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.