This requirement is a call-off contract using the UK Leisure Framework https://leisureframework.co.uk/ which is a specialist procurement framework supporting leisure centre building. The contract concerns the next stage as part of the Carlton Active project with a focus on preparatory, enabling and investigatory works required to prepare the property (Richard Herrod Site) for subsequent redevelopment
Terminas
26.05.2026
Paskelbta
19.08.2026
Sutartis suteikta
19.08.2026
Carlton Active Demolition Contract (Richard Herrod Centre)
Sutartis suteikta·Sep 21
Contract for the provision of media and digital communication platform
Sutartis suteikta·Aug 28
Refuse collection vehicles up to 44t
Sutartis suteikta·Aug 28
Cloud Legal Case Management and Time Recording software and associated services
Sutartis suteikta·Jul 30
Electoral Services Printing and Online Associated Services
Sutartis suteikta·Jul 13
Pre-construction design services Front Street Arnold
Sutartis suteikta·Jul 9
DNWP0037/LOT1B/ END STATES In Ground Mitigation / Tranche 4b remaining works
Sutartis suteikta·Oct 15
Mids - CDF Lot 2 - River Slea Ground Investigations and ESE (OBC-FBC)
Sutartis suteikta·Oct 9
Winfrith Pit 3 APC Soil Remediation Project
Sutartis suteikta·Oct 8
M18 Greenland Lane Deck Structure Replacement - Ground Investigation
Sutartis suteikta·Sep 29
GB-Sheffield: 5173.EFM.SW Runway Park Ground Investigations
Uždaryta·Sep 10
M62 Heathfield Landslip - Ground Investigation
Sutartis suteikta·Sep 9
CBC-1682-FA-LS-FC-58-ZH 35 Upper Shelton - AWARD
Sutartis suteikta·Oct 24
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.