Upgrades are required with respect of a number of Heat pumps requiring replacement in various areas around the school. The outcomes of undertaking the Heating to Classrooms and Administration Block project is primarily driven by replacement of assets at the end of life and will provide ongoing confidence to teaching and administrative buildings by maintaining environments with reduced maintenance outgoings, and equipment failures over the coming years. As works will affect ability for environmental control within both education and administrative spaces, it is proposed to undertake works during the summer holidays where minimal disturbance to students and staff can be expected. There are also some units to be relocated associated with the roofing project, so undertaking these at the same time will offer efficiencies. As there is some overlap between the Roof Remedial and Replacement Project and the Heating to Classrooms and Admin Project, priority of weathertightness being a key driver will necessitate the successful mechanical contractor to coordinate with the successful roofing contractor to deliver positive outcomes for the school, and to preserve warranties associated with the roof work project.
Paskelbta
14.09.2026
Priima pasiūlymus
14.09.2026
Terminas
12.10.2026
Main Roofing Contractor for gym roofing replacement at Heretaunga College
Priima pasiūlymus·Oct 22
Electrical Contractor for the Blocks B, C,D1, D3, L, 4: Lighting & Switchboard Replacement at Aorere College
Priima pasiūlymus·Oct 22
Main Building Contractor – E: Redevelopment at Queenstown Primary School
Priima pasiūlymus·Oct 22
Main Building Contractor - 1, 5,7: Roofing and Learning Space Upgrade at Tainui School
Priima pasiūlymus·Oct 22
Main Contractor for Block 8: Hessian and Wet Area Vinyl Replacement at Nga Iwi School
Priima pasiūlymus·Oct 22
Main Building Contractor for Toilet Refurbishment Project at Tamatea Intermediate
Priima pasiūlymus·Oct 21
Ngata Memorial College - Plumbing & Drainage Remediation Works
Priima pasiūlymus·Oct 16
Parkside Steam Safety Valves Project
Priima pasiūlymus·Oct 6
Mangatutu Bridge Replacement
Priima pasiūlymus·Sep 27
Lift Maintenance Contracts 2027
Uždaryta·Sep 22
Lift Maintenance Contracts 2027
Uždaryta·Aug 11
Contract 26/64 - Asbestos Survey and Reinspection - Advertising Notice
Uždaryta·Aug 4
Lake Terrace Water Treatment Plant Seismic Strengthening
Priima pasiūlymus·Oct 25
Wastewater Network Pipe Rehabilitation 2627
Priima pasiūlymus·Oct 23
Advance Notice - Coronial Support Services Procurement
Priima pasiūlymus·Oct 23
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Priima pasiūlymus·Oct 23
Contract 26/77 - Railway Drain Stormwater Treatment - Request for Tender – Advertising Notice
Priima pasiūlymus·Oct 23
14622 - Brigham Creek Roundabout Improvements Detailed Design (RFT)
Priima pasiūlymus·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.