High level summary of the project includes: Undertaken roof repair as there are leaks throughout. Installation of roof insulation and suspended ceiling. Upgrade of all glazing and doors (including fire doors). Strip out of existing M&E services/plant. Installation of VRV/VRF system and ASHP. Upgrade of all lighting and ensuring complete electrical installation is ATEX/DSEAR compliant. Note, a Stage 3 design and report will be provided and we would expect a stage 4 design/report before we progress with the build stage.
Paskelbta
18.08.2026
Priima pasiūlymus
18.08.2026
Terminas
15.09.2026
Modular Building Construction
Uždaryta·Jun 24
ATEX Remedials
Uždaryta·Jun 22
Cable Management System
Uždaryta·Jun 17
Rotary Frequency Converter
Uždaryta·Jun 8
Building Rewire Projects
Uždaryta·Jun 8
60Hz Transformer Purchase
Uždaryta·Jun 4
PR822021 - Domestic Gas Servicing and Installation
Sutartis suteikta·Oct 19
BaDC-1582 Gas, Oil, Solid Fuel Servicing & Repairs
Sutartis suteikta·Oct 14
Fusion21 - Design, Installation, Servicing, Maintenance and Testing of domestic heating systems.
Sutartis suteikta·Oct 7
Commercial Heating - Short Term
Sutartis suteikta·Oct 6
Heating Servicing, Repairs & Maintenance
Sutartis suteikta·Sep 16
CA17043 - Phase 4 Public Sector Decarbonisation Scheme
Sutartis suteikta·Sep 8
CBC-1682-FA-LS-FC-58-ZH 35 Upper Shelton - AWARD
Sutartis suteikta·Oct 24
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.