Noise barrier consumables include all small components required for the installation and fixing of the noise barrier system along the project alignment. These items typically include bolts, nuts, washers, nord locks, joint materials such as EPDM strips used during installation. Their purpose is to ensure the correct assembly, alignment, and secure fixing of the precast acoustic panels and associated elements to the supporting structure. These consumables are essential to achieve the required structural stability, durability, and acoustic performance of the noise barrier system.
Paskelbta
13.03.2026
Aktīvs
13.03.2026
Terminas
20.03.2026
BBV HS2 MWCC NORTH Flooring, screed, & tiling
Uždaryta·Oct 9
BBV HS2 MWCC NORTH - Fire Engineer Services
Uždaryta·Oct 8
BBV HS2 MWCC NORTH - Soil Scientists Secondments
Uždaryta·Mar 24
BBV HS2 MWCC NORTH - Soil Scientists Secondments
Uždaryta·Mar 24
BBV HS2 MWC North Rayleigh Waves
Uždaryta·Mar 13
BBV HS2 MWCC NORTH - Video conferencing Replacement plan
Uždaryta·Mar 13
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Homes England - Service Now & Operating Model Assessment
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.