This Scheme will cover Active Travel improvements on Shadsworth Road and Haslingden Road, Blackburn, and will encompass the following: • Removal of kerbed centre islands, • Alteration to existing zebra crossing • associated electrical works, • relocation of a kerbline and widening of the footway, • footway reconstruction as necessary, • Alterations to existing AD signage, • Removal and provision of new footway markings, • Footway surface course overlay using tarmac materials or slurry seal • carriageway patching.
Terminas
24.03.2026
Paskelbta
07.07.2026
Sutartis suteikta
07.07.2026
Carriageway Surfacing 25/26 - Phase 4
Sutartis suteikta·Sep 28
Carriageway Surfacing 25/26 (Phase 3)
Sutartis suteikta·Sep 28
Carriageway Surfacing 26/27 - Phase One
Sutartis suteikta·Sep 28
Active Travel 2026 - Phase 1
Sutartis suteikta·Jun 10
Tier 4 Detoxification: Lot 1 Inpatient Detoxification and Lot 2 Inpatient Residential Rehabilitation
Sutartis suteikta·Dec 10
Repairs to a Retaining Wall on Blackburn Road, Egerton
Sutartis suteikta·Oct 10
BBV HS2 MWCC North - Pumped Drainage
Priima pasiūlymus·Oct 21
Thrybergh War Memorial Civil Works
Sutartis suteikta·Oct 7
Greasbrough War Memorial Civil Works
Sutartis suteikta·Oct 7
Farrington Gurney Works NEC4 ECC Option A
Uždaryta·Oct 5
Lot 5: Highways Civil Engineering works up to £499,999 (excluding VAT)
Sutartis suteikta·Sep 11
Comberton Greenway - Sidgwick Avenue Construction
Sutartis suteikta·Sep 9
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Homes England - Service Now & Operating Model Assessment
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.