MetroLink is a transformative piece of new public transport infrastructure which will have 16 new stations running from Swords to Charlemont. The alignment will link Dublin Airport, Irish Rail, DART, Dublin Bus and Luas services and create a fully integrated public transport network for the Greater Dublin Area (GDA). The map below shows the extent of the route which is being developed by Transport Infrastructure Ireland (TII). MetroLink is currently at Railway Order stage, with a Railway Order having been submitted in mid 2022. Construction of MetroLink will impact the operation of Iarnród Éireann services on the Midland Great Western Railway (MGWR) and Great Southern and Western Railway (GSWR) railway lines at Glasnevin, which are themselves due to be upgraded as part of the DART+ West project. This DART+ West project is also currently at Railway Order stage, again submitted in 2022, and an Oral Hearing has been held in September and October 2023 on the scheme. Iarnród Éireann now propose to appoint an MDC to support Iarnród Éireann technically in understanding and agreeing the impacts of MetroLink on Iarnród Éireann heavy rail lines, in particular at Glasnevin and Tara Street Stations. The MDC will support technical issues across both design and proposed construction methods as both the DART+ and MetroLink projects progress.
Paskelbta
09.10.2024
Sutartis suteikta
09.10.2024
10066 - CME Exhaust Ventilation
Priima pasiūlymus·Oct 28
10022 Single Party Framework Agreement for Supply, Support and Management of Printer Services
Priima pasiūlymus·Oct 27
10046 - Fuel Tank Consultancy Inspections
Priima pasiūlymus·Oct 22
10072 - Sandblasting Maintenance and Equipment
Priima pasiūlymus·Oct 21
9657 - Dublin Division Letter Dropping
Priima pasiūlymus·Oct 21
9744 - Psychometric and Psychological Assessments
Priima pasiūlymus·Oct 15
Efficiency Assessments of Capital Projects at Dublin Airport
Uždaryta·Sep 14
Provision of a Multi-Party Supplier Framework for Evaluation Services for the Housing Agency
Sutartis suteikta·Oct 15
Provision of Economic Advisory Services related to Public Transport Provision
Sutartis suteikta·Jun 3
ComReg T09941. RFT to establish Multi Supplier Framework Agreement for the provision of Professional Services (non-legal) to the Commission for Communications Regulation
Sutartis suteikta·Mar 8
Provision of Economic and Technical Consultancy Support for Electricity Networks Price Review 6 (PR6)
Sutartis suteikta·Jan 11
New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
Priima pasiūlymus·Oct 30
2026/026 Establishment of a Single-Party Framework Agreement for the provision of the Design and Delivery of the “GROW360 PROGRAMME”
Priima pasiūlymus·Oct 30
Provision of Downhole Geophysical Logging Services
Priima pasiūlymus·Oct 30
OPW Tender for Cash Collection, Cash Processing and Cash in Transit Services
Priima pasiūlymus·Oct 30
Call for Tender for the Supply, Delivery and Commissioning Of VR Welding Simulators and Compatible VR Headsets for Donegal ETB
Priima pasiūlymus·Oct 30
Design and build Dublin Air Traffic Control Centre (ATCC) contingency room
Priima pasiūlymus·Oct 30
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.