Bay of Plenty Regional Council is seeking a suitably qualified civil construction contractor to deliver Whakatāne Project Future Proof – Stage 3B. The works involve reinstating and enhancing flood protection infrastructure adjacent to the Commercial Wharf along the true right bank of the Whakatāne River, including: -Site clearance and removal of existing structures, vegetation, floodwall sections, pavement and stormwater assets. -Pavement works, including excavation, footpath reconstruction, kerb and channel installation, concrete works, and reinstatement. -Pipe works, including removal and reinstatement of existing stormwater infrastructure and associated drainage works. -Construction of a new floodwall, including sheet pile installation, foundations, capping beams, and cast in-situ concrete wall panels. -Relocation and reinstatement of streetlight poles, electrical services, and other affected utilities. -Topsoiling, landscaping, and reinstatement of disturbed areas. The contractor will be responsible for maintaining flood protection during construction, implementing environmental, erosion and sediment control measures, and managing traffic, pedestrian access, and stakeholder communications to minimise disruption to businesses and the public. Responsibilities also include project management, site supervision, survey and set-out, utility protection and coordination, quality assurance, preparation of as-built documentation, and compliance with all health and safety, environmental, consent, and contract requirements.
Pubblicazione
01.07.2026
Aperta alle offerte
01.07.2026
Scadenza
24.07.2026
Huntly West Domain Courts Renewal
Ohineangaanga Stream Remediation Work / Erosion Repairs
Ohineangaanga Stream Remediation Work / Erosion Repairs
CON001926 - Whakatane Project Future Proof - Stage 4A
Contract 922 Reseal Professional Services
Advance Notice for Lower Piako River Right Bank Pipiroa to Ngatea Stopbank Upgrade Stages 2, 3 and 4
TWT o Putauaki - Toilet refurbishment - Block B - Boys and Girls
Advance Notice for Activity Based Costing (Software as a Service)
RFT - Main Roofing Contractor for Roofing Project at Halsey Drive School
Request for Tender - Main Contractor for D (T) Roof Replacement at Ashburton College
Main Contractor for Blocks A,B,C,E,F,G,J,M,NS,T,W,U Steel and Membrane Roof, Internal Gutters and Roof Parts Replacements at Waitakere College
Main Contractor for Blocks O,Q,R AMS and ILE Upgrade at Tuakau College
© 2026 SIA «Vietne». Tutti i diritti riservati.