The requirement is to provide a resilient MAN network connectivity for the six UCLH sites with one uplink to three distribution switches in three locations. To provide OS2 fibre from building cabinet to building cabinet using diverse links.
Scadenza
10.07.2026
Pubblicazione
24.08.2026
Aggiudicata
24.08.2026
© 2026 SIA «Vietne». Tutti i diritti riservati.