The Department of Corrections | Ara Poutama Aotearoa invites suitably qualified and experienced Main Contractors to register their interest in delivering the Waikeria Construction Project (Phase Two Expansion). The preferred full scope comprises three new accommodation buildings and associated infrastructure, providing up to 948 physical beds. The Project is proposed to be delivered under a traditional build-only model using an NZS 3910:2023 construction contract. This ROI is the first stage of a two-stage procurement process and will be used to identify and shortlist Main Contractors with the demonstrated experience, capability, capacity and financial resilience required to successfully deliver a project of this scale and complexity. Shortlisted Respondents will be invited to participate in a closed RFP process. Interested Main Contractors are advised that a site briefing is proposed for Thursday 27th August and registration details are provided in the ROI documents. All communication (other than registration for the Supplier Briefing session) should be through GETS.
Pubblicazione
20.08.2026
Aperta alle offerte
20.08.2026
Scadenza
18.09.2026
Alcohol and Other Drug Testing (AODT) In the Community
Christchurch Men’s Prison (CMP) Redevelopment Programme – Facilities Management and Maintenance Building – D&B Contractor
Veterinarian Services and Related Products
Advance Notice - Veterinarian Services and Related Products
Rongoā Māori Services in Prison
RFT - Main Contractor for Gym Alterations at Murchison Area School, Murchison, Tasman
Main Contractor for Block A Hall High Level Roof Replacement at James Hargest College
Main Contractor for 4: Toilet Refurbishment at Bayview School
NZDF New Build Housing - Budget 2026 Waiouru
Remedial Bridge Works
Main Contractor ROI for B Block Remediation at Epsom Girls Grammar School
RFP - Northland Trades Services Panel for Locksmith Projects and Maintenance Services
Vehicle Signage
RFT - Main Contractor for Gym Alterations at Murchison Area School, Murchison, Tasman
Main Contractor for Block A Hall High Level Roof Replacement at James Hargest College
Taihape Raw Water Falling Main Replacement Stage 6 Pt A – Railway
Main Contractor for 4: Toilet Refurbishment at Bayview School
© 2026 SIA «Vietne». Tutti i diritti riservati.