North East Lincolnshire Council is seeking a suitably qualified consultant to carry out surveys, testing, geotechnical investigations and reports for Railway Street Footbridge. The overall goal is to have all information needed for refurbishment design (including foundation details) and to inform a future temporary works design as required by Network Rail for lifting works etc adjacent to their tracks.
Pubblicazione
19.08.2026
Aperta alle offerte
19.08.2026
Scadenza
11.09.2026
© 2026 SIA «Vietne». Tutti i diritti riservati.