Otnox
DEGermania·Stazione appaltante: EnBW Energie Baden-Württemberg AG

Qualification System for Large Power Transformers (LPTs)

Chiusa·11 mag 2026

The present qualification system serves as the prequalification for the supply of three-phase power transformers ranging from 15 MVA to 100 MVA. Companies with the capability to deliver large power transformers for the 380kV grid in the above mentioned power range are invited to submit their requests for participation. This qualification system contains critical electrical data and implementation guidelines to ensure performance, safety and compatibility with our existing infrastructure.

Pubblicazione

11.05.2026

Aperta alle offerte

11.05.2026

Otnox

Trova gare a cui vale la pena partecipare.

Crei un account per approfondire questa gara e trovare opportunità simili.

  • Documenti di garaConsulta i file disponibili in un unico spazio di lavoro.
  • Requisiti e rischiRichiedi un’analisi dei documenti con riferimenti alle fonti.
  • La tua selezione di gareProsegui con i mercati e i settori selezionati.