The project involves the replacement of two chiller units located within the external plant compound at the Central Annexe Building, together with the installation of a new buffer vessel to support the upgraded cooling system. Key supporting works include: •Provision and installation of a temporary chiller unit to maintain building operations and cooling continuity during the replacement works. •Coordination with the separate chiller supplier, including delivery management and crane operations for installation. •Temporary modifications to the existing steel plant enclosure to facilitate removal and installation of plant. •Permanent structural modifications to the steel plant supports to accommodate and support the new chillers and buffer vessel. •Removal and upgrade of the associated electrical infrastructure. •Reinstatement, recertification, and making good of all affected fire stopping and compartmentation measures. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Pubblicazione
29.06.2026
Aperta alle offerte
29.06.2026
Scadenza
24.07.2026
HPFT - Warren Court New Mains Switch Panel Project
CA18455 - R9309 Ferguson House Emergency Lighting
QEHKL232 DC5 Control Panel Replacement
Replacement of DB Boards (SWQ3135,SWQ3136,SWQ3144,SWQ3164)
Barnes Z Block Distribution Board Replacement
W5007 Electric Vehicle Charging Network Infrastructure
ENQ1290 - Heritage Impact Assessment - Emerging Local Plan Allocations
CA15955 - South Thames College Group - External Audit Services
C472019 - Legal Services for a Court of Protection Matter (30)
DN815224 Lift Consultant - Project Manager
C470510 - Legal Support for Employee Relation Matters- Hempsons
Jobs and Career Services
© 2026 SIA «Vietne». Tutti i diritti riservati.