We are seeking to appoint a qualified and experienced subcontractor to supply floor gullies and floor drainage channels at Old Oak Common (OOC) HS2 railway station. The materials are either Stainless steel or Nickel bronze alloys to BS EN 1982. The gullies are for foul drainage.
Pubblicazione
18.06.2026
Aperta alle offerte
18.06.2026
Scadenza
26.06.2026
Old Oak Common - Lighting Controller Ancillary Equipment (LGHT1)
RETAIL METER UNITS - ELEC8
Marquee dismantle, move, re-erect ANTHRO-PROC-LOG8
FIELD DEVICES - PORTALS - ANTHRO-PROC-COMM14
Building Energy Management System (BEMS) - Ancillary Devices - ANTHRO-PROC-COMM8
Request for Proposal: Point Cloud Scanners for Construction Use
BBV HS2 MWCC North - Precast Concrete Attenuation Tank - Design, Manufacture and Deliver
Drainage Clearance and CCTV Inspection for SDDC Housing Stock
1100.03 V-Channel/Slipform
Meadows Renewal Project
BBV Delta Junction - HSST1040 Deck Subsurface Drainage
© 2026 SIA «Vietne». Tutti i diritti riservati.