The main purpose with the major overhaul is to ensure that the unit is in a condition where it can be oper-ated safely, reliably and efficiently. Today there are challenges with temperature differences between the lower casing and the upper casing. Scope: The “basic scope of supply” for the IP1 steam turbine major overhaul will include the following main activ-ities: • Cutting of the inlet steam pipe during disassembly and welding during assembly • Disassembly/opening of the steam turbine • Cleaning, blasting, NDT, fact finding, blue checks, measurements (before/after), etc. • Inspection and overhaul of 1 or more bearing(s) • Repairs of findings • Assembly and adjustments • Commissioning, tests and on-site balancing if needed
Pubblicazione
23.02.2026
Aggiudicata
23.02.2026
Vagtydelser til Fjernvarme Fyn
Chiusa·Jun 4
Isolation Transformer HAV32
Aggiudicata·Jan 27
Levering af biokedelsand
Aggiudicata·Oct 29
Levering af biokedelsand
Chiusa·Aug 12
HAV 34/35 150kV kabel, muffer og andet tilbehør
Aggiudicata·Jun 5
Tender for a complete 3-winding transformer 165/10.5/10.5kV with rated power of 100/50/50MVA
Aggiudicata·Sep 26
Light-udbud (genudbud) vedr. rammeaftale om levering af vikarer til Kredsløb
Aperta alle offerte·Nov 3
Overfaldsalarmsystem samt tilhørende udstyr til det sociale område i Region Syddanmark
Aperta alle offerte·Nov 3
Udbud af tre rammeaftaler vedrørende indkøb af træningsudstyr
Aggiudicata·Nov 3
Port of Aalborg Logistics A/S - Udbud af hydraulisk kran 2026 - Offentligt udbud
Aperta alle offerte·Nov 3
Rammeaftale om køb af Filspari (sparsentan)
Aggiudicata·Nov 3
Sorteringsanlæg til Biblioteket i Herning
Aperta alle offerte·Nov 3
Crei un account per approfondire questa gara e trovare opportunità simili.