NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontract Works includes for the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely complete the construction and handover of Highways/ footpaths works, as described in the specifications, drawings, HS2 standards Requirements and local authority specifications. The Subcontractor will be responsible for the temporary works design and temporary works construction as further detailed in this document. The subcontractor will be responsible for all permanent and temporary works relating to the Highways realignment unless otherwise excluded. The works included as part of this scope to be delivered by the subcontractor are: - Site clearance including Removal of existing drainage, kerbs, footpath, highway pavement, verges within permanent design location. - Earthworks including excavation to formation, soft spot treatment if required. - Drainage system, including temporary excavations, supply and installation of chambers, gullies, headwalls, carrier drains, filter and fin drains, fin drains, ditches, hydro brake system, non-return valve connection to existing drainage systems. - Service ducts: including supply and installation of service ducts, connections and chambers. - Road formation (asphalt surfacing by others): this includes supply and installation of geotextile separation materials highways and footways kerbs. Installation of capping and subbase layers Please express your interest within this package.
Pubblicazione
29.05.2026
Aperta alle offerte
29.05.2026
Scadenza
05.06.2026
EKFB JV - NC2A WGT Portal Buildings Blockwork package
Chiusa·Sep 16
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
Chiusa·Sep 15
EKFB JV - As - Built Surveys
Chiusa·Aug 27
EKFB JV - Waste Management Services
Chiusa·Aug 26
EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - Opportunity
Chiusa·Jul 31
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
Chiusa·Jun 23
Reconstruction of Smorthwaite Retaining Wall
Aggiudicata·Sep 16
A639 Thwaites Gate to M1 Junct 44
Aggiudicata·Aug 20
A61 Jumbles Lane - Carlton Lane
Aggiudicata·Jul 24
A66 - Scheme 3A - Penrith to Temple Sowerby - Compound Construction
Chiusa·May 12
A66 - Scheme 3A - Penrith to Temple Sowerby - Compound Construction
Chiusa·May 12
EKFB JV - Highways Works - NC2A draft
Chiusa·Apr 28
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Aggiudicata·Oct 31
March 2027 Bus Contracts
Aggiudicata·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Aggiudicata·Oct 30
Provision of Pre-Paid Cards
Aggiudicata·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Aggiudicata·Oct 30
Business Travel Services
Aggiudicata·Oct 30
Crei un account per approfondire questa gara e trovare opportunità simili.