Resurfacing of the footway and areas of the carriageway, and relaying of kerbs and tactile paving to alter levels for improved drainage. In the case of Nags Head Hill, there is also an introduction of a channel in the footway, and a temporary relocation of the existing traffic signals will be required. In the case of Air Balloon Road, there is the introduction of two new gulleys, a new manhole, and a new catchpit to tie into existing drainage. Direct award via Lot 5 Highways Civil Engineering works up to £499,999 (excluding VAT) of BCC's Highways Asset Management and Civils Framework
Scadenza
29.05.2026
Pubblicazione
28.08.2026
Aggiudicata
28.08.2026
Eastern Revetment Sloping Wall - Construction
CA16831 - Hartlepool College of Further Education are seeking Project Management, Design and Build via the CPC/JO/01/2025: Minor Works Dynamic Purchasing System 2 - Lots 1 & 2.
KSL - Nav - East Farleigh Asset Refurbishment
SSD - AOMR - Lymington Tidal Flaps Replacement
CA17816 - E-ACT Perry Court Academy - New Outdoor Canopy Install
CA17561 - E- ACT Trust further competition for SCA works at Blackley and TOAN Academy and Heating and Cooling at Royton & Crompton Academy
© 2026 SIA «Vietne». Tutti i diritti riservati.