• Reposition and reuse of defence stone material where suitable; • Construction of 250m of improved erosion revetment to provide protection from 1 in 100 year seawater overtopping events; • Extension to existing stone revetment; • Temporary site compound to facilitate the works
Scadenza
04.03.2026
Pubblicazione
18.09.2026
Aggiudicata
18.09.2026
CWF Lot 1B - Heart of Kendal - Indoor Market Detailed Design and Construction
Design and Install a Skate Park at Queens Park, Windermere via ESPO Framework 115_25 Lot 4
CWF Lot 2A - Reconstruction of Old Row, Stainton Retaining Wall
Lot 2B- Structural Assessments 2025-26
A66 Northern Trans Pennine Project Professional Consultancy Services
CWF Lot 2A - Cockley Beck Cattle Grid Replacement
PROPOSED DEMOLITION OF BLOCK A & ASSOCIATED WORKS AT CAMBRIDGE ROAD DEPOT
Bespoke Bus Shelter- Melton Mowbray
Ascent Homes - Coulson Park - Roads & Sewers
Penrith Road - M&E Works
Melton Mowbray x3 Shelters
**Direct Award** Marden Estate Phases 1&2 - Asbestos Removal
© 2026 SIA «Vietne». Tutti i diritti riservati.