In December 2025 investigatory works were undertaken to establish the condition of the reinforced concrete, concentrating mainly around half-joints and movement joints in the bridge deck. The results of these investigations have been incorporated in a set of construction drawings and a repair specification. This information will form the basis of a Stage 2 contract to implement repairs and replacement of movement joints.
Scadenza
01.06.2026
Pubblicazione
14.10.2026
Aggiudicata
14.10.2026
D-TRO Project 2026 Support Services
Aggiudicata·Oct 28
CareCubed Social Care Costing Software
Aggiudicata·Oct 27
Heron Hill - Window & Door Replacement
Aggiudicata·Oct 20
Legal Services Contract for the Heart of Barrow
Aggiudicata·Oct 20
CWF Lot 2A - Moss Side Cattle Grid Replacement
Aggiudicata·Oct 9
CWF Lot 2A - Town End (Orton) Bridge
Aggiudicata·Oct 6
Nether Bridge Parapet Repairs
Aggiudicata·Oct 6
Keswick to Threlkeld Bridge Deck Replacement Design and Installation
Aggiudicata·Aug 3
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Aggiudicata·Oct 31
March 2027 Bus Contracts
Aggiudicata·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Aggiudicata·Oct 30
Provision of Pre-Paid Cards
Aggiudicata·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Aggiudicata·Oct 30
Business Travel Services
Aggiudicata·Oct 30
Crei un account per approfondire questa gara e trovare opportunità simili.