Construction of a capping system over the landfill at Ailsworth Site along with improving the drainage system to allow management of rainfall and water flowing through the hazardous waste.
Scadenza
23.02.2026
Pubblicazione
03.08.2026
Aggiudicata
03.08.2026
Blaydon Quarry Landfill Gas Monitoring
Mids - AOMR - Lot 1 - Derbyshire Desilts
Mids - AOMR - Lot 2 - SGS Phase 5, 1 & 2 MCC Panel Replacement
WMD - Lower Risk Debris Screens - Site Supervisor - CPS Lot 1
SE - SCAPE - 46 Nine Elms Lane Pre-Construction Activities
SE - CPS Lot 1 - 46 Nine Elms Stakeholder Engagement Officer
© 2026 SIA «Vietne». Tutti i diritti riservati.