In 2024, a flood study was undertaken at Bentley Priory as per requirements under the 1975 Reservoirs Act. A thorough series of hydraulic testing was completed and a report was issued by the hydrologist team. The report produced seven areas of concern that needed addressing, this contract allows for provision of rectifying this.
Scadenza
18.05.2026
Pubblicazione
02.06.2026
Awarded
02.06.2026
East Anglia Modelling & Data 2026 Package 1
East Anglia Modelling and Data 2026 Package 2
East Anglia - (EAN) - CDF Lot 2 - Great Yarmouth Epoch 3 - Early Supplier Engagement (ESE) - OBC-FBC
UKIFS Justification Application Decision Document Preparation
Aurora Transformation - Atkins Role Development
Lower Risk Debris Screens - Design Authority - Herts and North London
CPU 8628 Mix It Potholes - Elastomac Works - Provision for delivery of statutory Highway Maintenance
Passenger & Goods Lift RTQ 2027 - AWARD
CWF Lot 1B - Heart of Kendal - Indoor Market Detailed Design and Construction
ASDA Roundabout Improvements
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
CPU 8629 Footway - City Centre Streetscape Resource re Masonry Works
© 2026 SIA «Vietne». Tutti i diritti riservati.