Deck realignment and jacking operation Tender There is a requirement to lower various bridge assets into please along the Curzon approach and a tender will be required to run for a short period to be able to meet the various key dates of the lowering of the bridge. While a scope of works is being put together the following are the basic requirements. o Provide a detailed temporary works Design for all equipment required to be used o Main scope: supply of the realignment and jacking system, and technical assistance for the operation on site with BBV self-delivering the works o As an option the supply of manpower and supervision to carry out the works in addition, including the bearing installation. Additional information: Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of work, prior to completing this expression of interest (EOI).
Pubblicazione
24.03.2026
Aktīvs
24.03.2026
Scadenza
31.03.2026
BBV HS2 MWCC North - Precast Concrete Attenuation Tank - Design, Manufacture and Deliver
BBV HS2 MWCC North - Architectural Construction Works - Buildings
BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts
BBV HS2 MWCC North - Project Wide Noise Barrier Acoustic Doors (Supply Only)
BBV Sublot 4 - HSST1020 - WWH Hydraulic Ramp reposition
BBV HS2 MWCC North - Project Wide Utilities Works
Liss Bridge Works
Milner Lane Culvert Rebuild (L1255) 2025
Westgate Fb (L2241) Concrete Repairs 2025
Syke Green Culvert (L1286) Headwall Replacement 2025
Marley Grove Retaining Wall (L3094) Repair 2025
ENQ1290 - Heritage Impact Assessment - Emerging Local Plan Allocations
CA15955 - South Thames College Group - External Audit Services
C472019 - Legal Services for a Court of Protection Matter (30)
DN815224 Lift Consultant - Project Manager
C470510 - Legal Support for Employee Relation Matters- Hempsons
Jobs and Career Services
© 2026 SIA «Vietne». Tutti i diritti riservati.