Noise barrier consumables include all small components required for the installation and fixing of the noise barrier system along the project alignment. These items typically include bolts, nuts, washers, nord locks, joint materials such as EPDM strips used during installation. Their purpose is to ensure the correct assembly, alignment, and secure fixing of the precast acoustic panels and associated elements to the supporting structure. These consumables are essential to achieve the required structural stability, durability, and acoustic performance of the noise barrier system.
Pubblicazione
13.03.2026
Aktīvs
13.03.2026
Scadenza
20.03.2026
BBV HS2 MWCC NORTH Flooring, screed, & tiling
Chiusa·Oct 9
BBV HS2 MWCC NORTH - Fire Engineer Services
Chiusa·Oct 8
BBV HS2 MWCC NORTH - Soil Scientists Secondments
Chiusa·Mar 24
BBV HS2 MWCC NORTH - Soil Scientists Secondments
Chiusa·Mar 24
BBV HS2 MWC North Rayleigh Waves
Chiusa·Mar 13
BBV HS2 MWCC NORTH - Video conferencing Replacement plan
Chiusa·Mar 13
Infrastructure Connection Design Support - Pathology Lab
Aggiudicata·Oct 30
Provision of Pre-Paid Cards
Aggiudicata·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Aggiudicata·Oct 30
Business Travel Services
Aggiudicata·Oct 30
Call-Off : GLCCA Project, Programme and Portfolio Management Solution
Aggiudicata·Oct 30
QLT354 2026-10-29 (0900) Leiston - Roman Hill Primary School, Lowestoft (8 seats and a PA) - AWARD
Aggiudicata·Oct 30
Crei un account per approfondire questa gara e trovare opportunità simili.