The BSI is seeking a supplier to deliver a Battery Energy Storage System (BESS) solution, including supply, installation, commissioning, and integration with the new Main Switchboard and related site electrical infrastructure. The system must support site electrification, improve energy resilience, optimise energy usage, maintain continuity of supply during outages, and enable integration with the new Main Switchboard and future infrastructure.
Pubblicazione
21.06.2026
Aperta alle offerte
21.06.2026
Scadenza
24.07.2026
ROI Non SF6 Circuit Breakers
DB2 Main Switchboard Upgrade (MSB)
Electricity Flexibility Solutions - Upper Clutha Area
TWT o Putauaki - Toilet refurbishment - Block B - Boys and Girls
Advance Notice for Activity Based Costing (Software as a Service)
RFT - Main Roofing Contractor for Roofing Project at Halsey Drive School
Request for Tender - Main Contractor for D (T) Roof Replacement at Ashburton College
Main Contractor for Blocks A,B,C,E,F,G,J,M,NS,T,W,U Steel and Membrane Roof, Internal Gutters and Roof Parts Replacements at Waitakere College
Main Contractor for Blocks O,Q,R AMS and ILE Upgrade at Tuakau College
© 2026 SIA «Vietne». Tutti i diritti riservati.