This project will replace the ageing automatic entry doors serving the main entrances to A Block and B Block together with the replacement of the existing passenger lift located in B Block. A and B Block Entrance doors: • Remove existing automatic entry doors. • Install new automatic sliding door system. • Remove existing Georgian wired glass screens. • Replace existing canopy roofing and cladding. • Remove asbestos cladding within project area. • Install new exterior cladding. • Install new internal and external timber screening. • Install new recessed entrance matting. • Reinstate existing access control system. B Block Passenger Lift: • Removal of existing lift equipment. • Installation of new lift. • New lift controls. • Modern accessibility features. • Improved reliability. • Compliance with current accessibility standards. Retentions are applicable. Contract works insurance to be arranged by WITT.
Pubblicazione
13.09.2026
Aperta alle offerte
13.09.2026
Scadenza
15.10.2026
K Block Extract System Upgrade
Aperta alle offerte·Oct 14
A-block Level 3 Science Lab Fitout
Chiusa·Sep 13
UNITEC Facilitation of Wananga on Stakeholder Aspirations in Vocational Education and Training
Aggiudicata·Dec 19
RFP Engineering Services
Aggiudicata·Dec 19
ARA L Block Seismic Strengthening Project
Aggiudicata·Dec 19
RFP Unitec Building 114 HVAC Upgrade
Aggiudicata·Dec 19
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Aperta alle offerte·Oct 23
Main Building Contractor for H O Student Toilets Refurbisment at Tahatai Coast School
Aperta alle offerte·Oct 18
Main Building Contractor for Blk A B Toilets Heating Electrical Upgrades & Classroom Remediation at Taradale High School
Aperta alle offerte·Oct 15
Ngā Taupuni restroom refurbishment
Chiusa·Sep 30
A-block Level 3 Science Lab Fitout
Chiusa·Sep 13
Main Contractor for Project 262660 A B C N F K S T U V Roofing Drainage Electrical Cladding Plumbing at Edgecumbe Primary School
Chiusa·Aug 27
Seatoun Tunnel Repainting
Aperta alle offerte·Nov 4
130-140 Grafton Rd Retaining Wall Construction
Aperta alle offerte·Nov 4
RFP Security Fencing OTRFP2026_649
Aperta alle offerte·Nov 3
ROI - Drainage Contractor for Kaipara College - Site: Drainage Remediation
Aperta alle offerte·Nov 3
Main Contractor for the Site: Carpark, Footpaths and Bus Shelter at Northcross Intermediate School
Aperta alle offerte·Nov 3
Main Contractor for the Blocks 2, 11: Re-aligning classroom walls, Removal of ACM cladding, and Classroom Refurbishment at Northcross Intermediate School
Aperta alle offerte·Nov 3
Crei un account per approfondire questa gara e trovare opportunità simili.