The University of Waikato is seeking a suitably qualified and experienced solar contractor to provide the design, supply, installation, commissioning, and integration of rooftop solar photovoltaic (PV) systems as part of Stage 2 of the University’s Solar Programme. The works comprise two sites: M Block at the Hamilton Campus and the TCBD building at the Tauranga Campus. This project forms part of the University’s sustainability and carbon reduction programme and its pathway toward carbon neutrality by 2030. The University is seeking a turnkey design-and-construct solution for replacement of the existing PV panels, with upgrades to existing associated equipment only where required or recommended at M Block, Hamilton Campus and a new installation at TCBD, Tauranga Campus including all design, supply, installation, electrical integration, commissioning, approvals, monitoring and handover requirements.
Pubblicazione
01.10.2026
Aperta alle offerte
01.10.2026
Condizioni aggiornate
01.10.2026
Scadenza
06.11.2026
323443 - Proposed UniRec New Build Project
Chiusa·Oct 4
327414 - STEM Blocks C–F Façade Concrete Panels Remediation
Chiusa·Sep 24
327349 - Lift Replacement in MSB and G Block
Chiusa·Sep 18
319604 - Provision of Simulated Participants for Clinical Education and Assessment
Chiusa·Sep 8
322859 - Security Services
Chiusa·Aug 28
324523 - Enterprise CCTV Solution - Supply, Implementation, Migration and Support
Chiusa·Aug 28
Nelson Hospital Electrical Upgrade
Chiusa·Oct 13
Southland Hospital MSB5 Ring Main Unit Replacement
Chiusa·Sep 18
Lighting Pole Replacements
Chiusa·Sep 14
Advanced Notice: Rogan Street Signalisation Project
Chiusa·Sep 8
11kV Controls Upgrade
Chiusa·Jul 7
Seatoun Tunnel Repainting
Aperta alle offerte·Nov 4
130-140 Grafton Rd Retaining Wall Construction
Aperta alle offerte·Nov 4
RFP Security Fencing OTRFP2026_649
Aperta alle offerte·Nov 3
ROI - Drainage Contractor for Kaipara College - Site: Drainage Remediation
Aperta alle offerte·Nov 3
Main Contractor for the Site: Carpark, Footpaths and Bus Shelter at Northcross Intermediate School
Aperta alle offerte·Nov 3
Main Contractor for the Blocks 2, 11: Re-aligning classroom walls, Removal of ACM cladding, and Classroom Refurbishment at Northcross Intermediate School
Aperta alle offerte·Nov 3
Crei un account per approfondire questa gara e trovare opportunità simili.