Otnox
UKUjedinjeno Kraljevstvo·Naručitelj: London Borough of Hillingdon

West Drayton Academy Roof Replacement Works

Dodijeljeno·4 Aug 2026·GBP 257,597

The works are to include, strip the existing waterproofing system in all its parts, including insulation, back to the underlying Cross Laminated Timber deck. Inspect the existing deck for degradation and repair/ replace as necessary. Supply and install a new High-Performance Elastomeric TA-30 warm roof RBM system, incorporating a Parafoam Ultra Tapered Board Insulation scheme, achieving the maximum required U-value of 0.18 W/m²K. All works to include the temporary removal and reinstatement of all mechanical & electrical services.

Rok

12.02.2026

Objavljeno

04.08.2026

Dodijeljeno

04.08.2026

Otnox

Pronađite nabave u kojima se isplati sudjelovati.

Izradite račun kako biste istražili ovu nabavu i pronašli slične prilike.

  • Dokumentacija o nabaviPregledajte dostupne datoteke u jednom radnom prostoru.
  • Zahtjevi i riziciNaručite analizu dokumenata s poveznicama na izvore.
  • Vaš odabir nabavaNastavite s odabranim tržištima i sektorima.