Expression of Interest T5D MEP Subcontractor T5D Attenuator Overhaul (Survey / RIBA 4iii) Scope The T5D Rail-tunnel Ventilation Shaft is located adjacent to T5D at its North and can be accessed from the bottom (Level 6) via the trackside of the HEX tunnel or from the top (level 7) via Airside. The objective is to replace the four attenuators in the T5D Shaft because they are at their end of life. The renewal of the T5D attenuators aims to reduce the risk of debris entering fans, tunnels and station, prevent the fans from failing in any fire scenario and provide ventilation and smoke clearance for the Heathrow Rail Tunnels. This improves safety conditions in Heathrow Rail Tunnels and improves resilience of systems. In addition, less maintenance and repair are required for the attenuator. Each attenuator is formed of four quadrants weighing around 1160 kg. Review MEP systems along the airflow and advise replacement/modification to bring them up to compliance. Surveys will be carried out by MEP Subcontractor under the direction of the Design Consultant (Employed by the Client). Item Question Q1 What capability do you have of understanding the requirements for replacing attenuators etc., considering the constraints of an operational rail network? Q2 What capability do you have of carrying out a survey of the T5D Shaft during non-operational hours to provide all the information required to complete the RIBA 4ii design by the Design Consultant and the RIBA 4iii by the MEP Subcontractor? • M&E Services within the air path • Fan and Attenuator • Structure Note: - RIBA 5 onwards including construction is excluded.
Publié
02.06.2026
Aktīvs
02.06.2026
Date limite
09.06.2026
WP1140 - T5D Design Consultant
Clôturé·Jun 2
WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Clôturé·Jun 2
WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Clôturé·Jun 2
WP6235 -T5D MEP Subcontractor
Clôturé·Jun 2
WP1140 - T5D Design Consultant
Clôturé·Jun 2
WP2140 - TR19 MEP Surveys
Clôturé·May 7
Sharnberry Mine Water Treatment Scheme (MwTS) Design & Build - Phase One
Attribué·Oct 30
Arts and Sports Bridge - Pre-Construction Professional Services
Attribué·Sep 23
HVAC design and Support services 2026
Attribué·Jul 31
Project Callisto
Clôturé·Jul 6
Members' Tea Room Refurbishment Project - MDS4001
Attribué·Jun 25
Cbip-Ws2-Risk Reduction-Mds-Riba2-Fwk1146-Mds4003
Attribué·Jun 25
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.