The Trust has a requirement for the replacement of Electrical Substation 9 and an upgrade to the Evelina standby power system. The objective of the project is to remove the obsolescence risk for the existing LV electrical switch panels, and interlinked stand-by generators to meet the requirements of the existing electrical services. This requirement needs to be delivered to allow for the expansion for the 'Evelina PTC' and the additional power requirements and system resilience that this project demands. This paper recommends the award of a contract to ETA Projects Ltd. The new contract will help provide the Trust with a safe and reliable source of power into the future removing the reliance on hired in temporary generators and the expansion of the Evelina Children's Hospital for cancer treatment. This was awarded through the HTE framework Consultancy Solutions and Advisory Services 2023/S 000-024003
Date limite
31.10.2025
Publié
03.08.2026
Attribué
03.08.2026
Structural and Civils Designer - Somerset and Samaritan Wards
Mechanical, Electrical , Public Health (MEP) Design, Albert, Somerset & Samaritan Wards
Quantity Surveyor Cath Lab and LMER Programmes
Ward Programme (Albert, Somerset, Samaritan Wards) RIBA 0-2 - Architect
St Thomas' Hospital Energy Project - Contract Mobilisation and Project Management Support
Fire Damper Panel Works for Guy's Hospital
CA18255 - RFQ2026/24 - NMANDD PEACEPLUS Thriving Together-Minority Community Support Programme: Sports for All for the Newry, Mourne and Down District Council area.
Creative Sector Services CIC (t/a Creative United) Take it away Scheme Credit Provider Contract
Childrens Playtower
2026-09-07 09:00 - QTN048 Exning to Stanton Community Primary School, Stanton - AWARD
Revenues and Benefits Printing and Mailing Service
ITT for project 10181682
© 2026 SIA «Vietne». Tous droits réservés.